Factory Preassembled Reel to Trench MMO Linear Anode Direct Burial System Reduced Field Labor Cost
Datos del producto:
| Lugar de origen: | Porcelana |
| Nombre de la marca: | High Broad or OEM |
| Certificación: | ISO 9001, Full Batch QC |
| Número de modelo: | MMO-RT-009 |
|
Información detallada |
|||
| Tipo de ánodo: | Lineal MMO preensamblado de carrete a zanja | Opciones de carrete: | Madera (Exportación) / Acero (Retornable) |
|---|---|---|---|
| Longitudes estándar: | 100 m, 200 m, 500 m por carrete | Ahorro de trabajo: | Hasta un 40 % frente al montaje in situ |
| Contenido: | Ánodo, cable, relleno, chaqueta, empalmes, cuerda de tracción | control de calidad: | Probado en fábrica, trazabilidad de lotes |
| Resaltar: | Ánodo MMO de carrete a zanja,CP de entierro directo preensamblado,Sistema de ánodo de ahorro de mano de obra de campo |
||
Descripción de producto
Reel-to-Trench MMO Linear Anode — Direct Burial System
Stop assembling anodes in the field. Our factory preassembled reel-to-trench system delivers complete, tested MMO linear anodes on deployment reels — pull, lay, connect, and bury. Field labor is reduced to three simple steps.
What's On the Reel
Every reel contains a complete, ready-to-install anode system:
- MMO/Ti anode wire — factory tensioned, no kinks
- Copper conductor cable — pre-connected at all splice points
- Coke breeze backfill — uniformly packed and contained
- Synthetic jacket — factory-sewn, seam integrity guaranteed
- All splice connections — epoxy sealed and Helium Leak Tested
- Pull rope and deployment instructions
Cost Comparison
| Item | On-Site Assembly | Reel-to-Trench |
|---|---|---|
| Labor (per 100m) | 16-24 man-hours | 4-6 man-hours |
| Splice Quality | Field-dependent | Factory guaranteed |
| Backfill Uniformity | Variable | Mechanically controlled |
| Weather Dependency | High | Minimal |
| QC Documentation | Limited | Full batch traceability |
Reel Specifications
Available in wooden (export) or steel (returnable) configurations. Standard lengths: 100m, 200m, 500m per reel. Custom lengths available.
Applications
- Large-scale pipeline CP projects
- Remote locations with limited skilled labor
- Fast-track construction schedules
- Projects requiring full QC documentation